Brilliant Expansion Tailrace Cleanup Project

 

Owner: Brilliant Expansion Power Corporation

 

July, 2008 - December, 2008

 

JJM will build an access berm out into the Kootenay river, install a 64m long soldier pile deflection wall, clean out the main and auxiliary rock traps, remove rock debris from the BRX tailrace, remove piles and concrete residual from BRX coffer dam, dredge downstream riverbed to design elevations, and then remove the access berm as we exit the river.

 

Project Contacts:     

Craig Peddie, Project Manager
Greg Reid, Project Manager
Larry Relkoff, Project Coordinator


This project is approximately 95% complete.