8218 River Way, Delta BC V4G 1C4

604.946.0978

Scour Protection Works at Terasen Gas Pitt River

Project: Scour Protection Works at Terasen Gas Pitt River
Duration: November, 2010 to January, 2011
Owner: Terasen Gas

Perform pre and post construction hydrographic surveys. Perform a pre-construction diver survey of the pipeline alignment. Supply and place an estimated 9,800 cubic metres of rock and gravel as scour protection over the Terasen Pitt River Crossing natural gas pipeline. Prepare and submit "As-Built" drawings to Terasen.