River Road Upgrade - Phase 3

Location: River Road, Delta, BC
Duration: July 2010 to July 2011
Owner: Corporation of Delta

This project work involves the widening of River Road from 8500 to 8900 Block.

The work is divided into two stages:

Stage 1 - Ditch Enclosure and Preload

Stage 2 - Preload Removal and Road Construction

The work generally consists of common excavation, installation of Dia. 1050mm Weholite storm sewer, manholes and connections, headwalls, lock block walls, installation of Dia. 300mm PVC culverts across driveways and granular sub-base and preload fill in stage 1 and removal of preload, placement of granular base, HMAC paving, concrete curbs and sidewalk, pavement markings, installation of road signs, installation of street lighting and landscaping in stage 2.