8218 River Way, Delta BC V4G 1C4

604.946.0978

Port Mann C13 Sanitary Sewer Relocation

Installation of approximately 900 metre long dia. 1800mm sewer line.

Work generally includes:

  • Installation of piles supported Dia. 1800mm HDPE lined concrete pipes c/w manholes;
  • Installation of concrete piles and concrete pipe cradles;
  • Excavation for tie-in chambers, forming and placing of concrete for tie-in chambers.

Owner: Kiewit-Flatiron General Partnership